Cam Lo – La Son Expressway

Hình ảnh dự án Cao tốc Cam Lộ – La Sơn

20231108_153501
20231108_164113
20231108_154509
20231108_115653
20231108_115648
20231108_115208
20231109_080434
20231109_085601
20231109_093857
20231108_154501
2-1
1-1 copy
20231108_153501 20231108_164113 20231108_154509 20231108_115653 20231108_115648 20231108_115208 20231109_080434 20231109_085601 20231109_093857 20231108_154501 2-1 1-1 copy

Project: Investment and construction of the Cam Lo – La Son section of the investment project to build a number of expressway sections on the East North-South route in the 2017-2020 period

Developer Ministry of Transport – Ho Chi Minh Road Project Management Board
Building type, level Group A project, Road traffic works, grade I
Location Huong Thuy Town, Thua Thien Hue Province
Scale Consultancy on survey, technical design, estimate making, installation of site clearance and special purpose piles, preparation of bidding documents for construction and installation bidding packages from Km69+00 – Km102+200
 Bidding Consultancy on survey, technical design, estimate making, installation of site clearance and special purpose piles, preparation of bidding documents for construction and installation bidding packages from Km69+00 – Km102+200
 Total investment
Consultancy service value 6.72 billion VND
Investment capital
Time Started September 16, 2019, expected to complete in 2021

Once completed, the project will promote efficiency, connecting the entire expressway from Quang Tri to Quang Ngai, creating a driving force contributing to the economic, cultural and social development of localities and regional linkages.

Project overview

We, Phu Thai consulting company, are very proud to participate in consulting for the important project ‘Investment in the expansion of National Highway 1, section Km1462 – Km1692, Binh Thuan province’ in the form of B.O.T contract. This project is invested by the Ministry of Transport – Ho Chi Minh Road Project Management Board, belongs to group A project, is a grade I road traffic work.

The project is located in Huong Thuy town, Thua Thien Hue province. The scale of the project includes surveying consultancy, technical design, estimation, site clearance piles and special land clearance piles, preparation of bidding documents for construction and installation bidding packages for the section Km69+00 – Km102+200. The project aims to widen National Highway 1, creating an efficient and convenient transportation system for residents and visitors.

We undertake the bidding package of survey consultancy, technical design, estimate making, installation of site clearance piles and land clearance piles, preparation of bidding documents for construction and installation bidding packages for the section Km69+00 – Km102+200. The value of our consulting services for this project is VND 6.72 billion. The project started on September 16, 2019 and is expected to be completed in 2021.

We are committed to providing quality and reliable consulting solutions to ensure the progress and quality of National Highway 1 expansion works. We are proud to contribute to the development and improvement of the transport system of Binh Thuan province, contributing to creating a good living and working environment for the community.

Project info

Cam Lo – La Son Expressway is part of the North-South Expressway project, passing through 9 districts and towns of the two provinces of Quang Tri and Thua Thien Hue; using government bonds.

In the first phase, this expressway has two lanes, the width of the roadbed is 12m. Particularly, the deep excavation sections have 2 lanes, the width of the roadbed is 23m; The overtaking sections have 4 lanes and the width of the roadbed is 23m. In the completed phase, the whole route has a scale of 4 lanes.

Along with the La Son (Thua Thien Hue) – Tuy Loan (Da Nang) section, which is about to be completed, the project will form an expressway in the Central region, connecting Quang Tri to Quang Ngai.

The Ministry of Transport assesses that the construction of Cam Lo – La Son expressway is urgent, meeting the requirements of high-quality road transport, while the parallel national highway 1A is limited in speed when passing through urban areas. The project is expected to be completed in 2021.

Project Map

Design

In the first phase, this expressway has two lanes, the width of the roadbed is 12 .