Embankment of Nam La stream

Hình ảnh dự án Kè suối Nặm La

2
1
8
7
6
10
4
5
9
11
12
13
2 1 8 7 6 10 4 5 9 11 12 13

Project: Project Nam La Stream Embankment, Son La City, Son La Province

Investor Son La Hydropower Plant Migration and Resettlement Project Management Board
Type and grade of works Agricultural and rural development works and traffic works and technical infrastructure. Grade III works, group B projects
Location Hoa Binh City, Hoa Binh Province
Scale
  • Irrigation Category:Design and construction of embankments on both sides of the stream with a total length of about 10 Km
  • Traffic items: Roads on both sides of the stream are designed according to urban road standards
  • Items of technical infrastructure: Synchronous design of lighting systems, transformer stations, trees…
 Bid
  •  Consultation on surveying, making construction investment projects
  •  Consultancy, survey, design, construction drawings and cost estimates
 Total Investment
Value of consulting services  14.58 billion dong
Investment capital
Time 2015 – 2016

Project overview

We, Phu Thai consulting company, are very proud to participate in consulting for the important project ‘Investment in the expansion of National Highway 1, section Km1462 – Km1692, Binh Thuan province’ in the form of B.O.T contract. This project is invested by the Ministry of Transport – Ho Chi Minh Road Project Management Board, belongs to group A project, is a grade I road traffic work.

The project is located in Huong Thuy town, Thua Thien Hue province. The scale of the project includes surveying consultancy, technical design, estimation, site clearance piles and special land clearance piles, preparation of bidding documents for construction and installation bidding packages for the section Km69+00 – Km102+200. The project aims to widen National Highway 1, creating an efficient and convenient transportation system for residents and visitors.

We undertake the bidding package of survey consultancy, technical design, estimate making, installation of site clearance piles and land clearance piles, preparation of bidding documents for construction and installation bidding packages for the section Km69+00 – Km102+200. The value of our consulting services for this project is VND 6.72 billion. The project started on September 16, 2019 and is expected to be completed in 2021.

We are committed to providing quality and reliable consulting solutions to ensure the progress and quality of National Highway 1 expansion works. We are proud to contribute to the development and improvement of the transport system of Binh Thuan province, contributing to creating a good living and working environment for the community.